Safety Integrity Level (SIL), 3-4 July 2012

Published on Feb 27 2012 // Safety and Risk Assessment Training
Safety Integrity Level (SIL), 3-4 July 2012
SAFETY INTEGRITY LEVEL (SIL) TO COMPLY WITH THE IEC61508 & IEC 61511 TWO DAYS PUBLIC TRAINING 3-4 July 2012 PARK-LANE-HOTEL,JAKARTA FOREWORD ************ The International Electrotechnical Commission (IEC) provides an IEC61508 & IEC 61511 standard. These codes are established rules of the...

Process Safety Management (PSM) Practices, 16-18 July 2012

Process Safety Management (PSM) Practices, 16-18 July 2012
Process Safety Mangement Practices THREE DAYS PUBLIC TRAINING The Park Lane Jakarta, 16 – 18 July 2012 FOREWORD A process safety management (PSM) is a part of safety management and engineering system. The PSM system aims to ensure that technology facilities such as chemical plants, refineries,...

RCM & RBI Implementation, 19-22 June 2012

RCM & RBI Implementation, 19-22 June 2012
Four Day Public Training 19-22  June 2012 OVERVIEW ************ Kegiatan maintenance pada dewasa ini memegang peran penting dalam dunia Usaha. Bidang maintenance engineering telah mengalami perkembangan yang Sangat signifikan dalam dua dekade terakhir, terutama sejak diperkenalkannya Reliability...

PIPING & PIPELINE INTEGRITY MANAGEMENT SYSTEM To COMPLY WITH ASME B31, 24-28 September 2012

Published on Oct 29 2011 // Training Events
PIPING & PIPELINE INTEGRITY MANAGEMENT SYSTEM To COMPLY WITH ASME B31, 24-28 September 2012
Five Days Public Training Pullman – HOTEL, Grogol – JAKARTA, 24-28 September 2012 COURSE OUTLINE: ******************** The Piping Systems & Pipeline Code establishes rules of the design, inspection, maintenance and repair of piping systems and pipelines throughout the world....

Experience

Published on Oct 27 2011 //
Handal Consulting as a global safety, risk and integrity management company has been involved in several consulting services in many companies in Indonesia.   The following challenging projects has been conducted and completed to help businesses meet regulatory requirement, protect their reputation...

PIPELINE SYSTEMS DESIGN, CONSTRUCTION, MAINTENANCE AND ASSET MANAGEMENT, 15-19 October 2012

Published on Oct 22 2011 // Training Events
PIPELINE SYSTEMS DESIGN, CONSTRUCTION, MAINTENANCE AND ASSET MANAGEMENT, 15-19 October 2012
INTRODUCTION Within industry, piping is a system of pipes used to convey fluids (liquids and gases) from one location to another. The engineering discipline of piping design studies the efficient transport of fluid. Industrial process piping (and accompanying in-line components) can be manufactured from...

Risk Based Inspection In-house Training

Published on Oct 05 2011 // Reliability and Maintenance Training
Risk Based Inspection In-house Training
Risk Based Inspection In-House Training PT. Indonesia Power, Sept’ 2010 Thank you for the opportunity to be a part of your engineers team

Syllabus Engineering and Management

Published on Jan 03 2011 // Engineering and Management
Syllabus Engineering and Management
” Engineeering & Management” 1. Mechanical PIPING & PIPELINE INTEGRITY MANAGEMENT SYSTEM WITH ASME B 3.1 The Piping Systems & Pipeline Code establishes rules of the design, inspection, maintenance and repair of piping systems and pipelines throughout the world. The objective...

Headline News

Published on Oct 25 2010 //
Headline News
Maintenance Excellence & Optimization, Public Training; 28 Sept’ – 01 Oct’ 2010 Risk Based Inspection In-House Training PT. Indonesia Power, Sept’ 2010 NEBOSH IGC, Bandung 4-16 Oct’ 2010

Photo-Gallery-3

Published on Oct 04 2010 //
Photo-Gallery-3
Maintenance Excellence and Optimization Public Training; A strategy to developing & improving Life Cycle Asset Management Bandung, 28 Sept’ – 1 Oct’ 2010 Thank you for all the delegates that attended this training program Risk Based Inspection In-House Training PT. Indonesia...
Subscribe to our RSS Feed! Follow us on Facebook! Follow us on Twitter! Visit our LinkedIn Profile!